magazine

Stay Connected with Engineered Systems
We are on Facebook, Twitter, LinkedIn, etc.

Articles by Rebecca Thatcher Ellis, P.E.

commissioning: DECOMMISSIONING

As with last month, I'd like to introduce a new commissioning term, which isn't exactly mainstream in the commercial and institutional building industry. This time, the word of the month is decommissioning. Although a rigorous process of decommissioning has been standard operating procedure for a number of years at the Pentagon Renovation Program, I have otherwise only heard of it with respect to nuclear power plants, naval vessels, and some industrial installations.
Read More

Commissioning: Presenting Pre-Commissioning

The commissioning lexicon currently includes terms such as recommissioning, retro-commissioning, and continuous commissioning. This month, I'd like to explore a concept that may not be new, but which I believe is an integral part of commissioning a building renovation project. By giving it a name, I'm hoping it may be more likely to become common practice. I'd like to dub it pre-commissioning.
Read More

commissioning: PINPOINTING Building Success

What is the definition of a great building? One of the keys to success for a great building project is achieving the intended performance (design intent) of the building systems at the end of the project. However, owners don't usually undertake the effort and expense of a capital project in order to simply say that the project was great. Owners want buildings that stay great and meet the needs of the people and programs for which the buildings were designed and constructed.
Read More

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
5/13/15 11:00 am EDT

When's & Why's of Fuel Options and Selection for Backup Power

This presentation will bring listeners up to speed on what the best options are today and in the near future. 

Engineered Systems Magazine

cover

2015 April

Check out the April issue of ES with the cover story: Discovery vs. Disaster: Why You Should Know The Limits Of Your Data Center.
Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

With access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon  Google+