Columns

Commissioning

Unsampled Systems

Choosing not to sample every system can be a gamble, but here are some ways to lower your risk.
Over the past two months, this column has addressed the issue of sampling systems for field functional performance testing
Read More
Tomorrow’s Environment

Preparing For And Assisting In System Startup

When it’s time to flip the switch, design engineers must be present to ensure proper system design.
Many consulting engineers will tell you that time invested in the construction phase is beyond their scope of work and, of course, the fee has been all used up and “we can’t afford to waste our time” with equipment and associated system startup.
Read More
Editor's Note

Sensors & Suspicions

A couple of residential-oriented events give us pause for thought in the nonresidential sectors.
Jeff Seewald touched on the progress of home thermostats — and in particular, the Nest products that have done so well the last couple of years — when he sent me his latest installment on using tablets and new tech in engineering (look for it in March).
Read More
Building Automation

Chiller Plant Control

While chilled water plants can range in complexity, the fundamentals are the same.
Chilled water plants tend to be one of the most energy intensive areas of a commercial building.
Read More
Commissioning

Functional Performance Test Sampling

So you’ve decided on your sample size. What next? What happens when a system failure is found?
Last month, this column addressed the need for (and philosophy behind) sample testing certain systems when 100% functional performance testing (FPT) is impractical from a time and/or budget perspective.
Read More
Case In Point

Successful piping solution helps beer go from brew room to tap

The owners of Aardwolf Brewery in Jacksonville, FL, are not taking any chances when it comes to their up-and-coming business. That attitude is what led them to select Aquatherm as an important component for their brewing room.
Read More
Building Automation

Controls Retrofits – Preserving Smoke Control

Follow these three steps when it comes time to upgrade critical life safety manage-ment.
Following a tragic fire in a Las Vegas hotel in the 1980’s, the industry recognized the dangers to occupants from smoke inhalation during a fire emergency.
Read More
Back 2 Basics

Building Program to Basis of Design for an Assisted Living Building Renovation Project

At some point in time, most building owners make the business decision to build, renovate, or expand their facilities.
Read More
Commissioning

Functional Performance Test Sampling

Testing it all typically isn’t an option. How to determine what (and how many) to check?
In the standard commissioning process, there are two primary technical activities that occur on site at the end of construction and prior to systems acceptance by the owner.
Read More
Tomorrow's Environment

Preparing For And Completing A Construction Site Field Visit

Here are some things to remember, bring along, and follow up about when seeing how the project is going.
Here are my suggestions for preparing to complete a construction administration site visit as the design engineer for the project.
Read More

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!

Engineered Systems Magazine

image

2014 December

Check out the December 2014 issue of Engineered Systems.
Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!