ES mobile app

Coming Soon...our new mobile app!

Relay and overload kits

September 17, 2010
/ Print / Reprints /
ShareMore
/ Text Size+

Tecumseh Products Company has released its “K” Replacement Relay and Overload Kits for service professionals. The kits are designed to simplify servicing of compressor relays and overloads on refrigeration and air conditioning equipment. Genuine Tecumseh electrical components are included, along with the necessary hardware (leads, terminal adapters and mounting screws) needed to make installation quick and easy.

Tecumseh “K” Kits reduce the installation time required by service technicians, necessitate less shelf space and provide higher inventory returns for wholesalers, and offer easy stocking and identification with appropriately sized Tecumseh logo boxes and labeling.

The new product offering provides for more than 98% coverage of all compressor models currently sold through wholesale distribution with just 22 relay and 40 overload kits. Tecumseh “K” Kits are available to U.S.-based Tecumseh Authorized Wholesalers beginning September 7th.

Cross reference information is available to customers along with an application guide. Installation instruction sheets, complete with wiring diagrams (where applicable), are included with every kit. Tecumseh “K” Kits and replacement electrical components are warranted for 20 months from the date of manufacture.
You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
3/27/14 11:00 am EST

How to Calculate Backup Power Supply Requirements for Your Facility

On-Demand This webinar reviews how to determine power requirements of facility loads; electrical characteristics and impact of different types of loads such as large motors and UPS systems on power supply sizing; acceptable power sources and other constraints applied by building codes; and how software tools can be used to simplify the process of calculating backup power requirements.  

THE MAGAZINE

Engineered Systems Magazine

ES April 2014 cover

2014 April

Check out the April 2014 issue of Engineered Systems, with features on backup power supply requirements, cyberattacks, and much more!

Table Of Contents Subscribe

Design Flaws

Following up on Howard McKew's April "Tomorrow's Environment" column: Have you ever thought twice about reporting problems with another firm's design? What did you do?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon