The first part of this M&V discussion addressed the importance of the Measurement & Verification (M&V) plan and my suggestion that it be a prerequisite to any LEED certified job. When you read the explanation of the M&V plan in the LEED 2.2 manual, it says a lot but leaves a lot to be desired, beginning with what I consider to be a negative “Intent” statement: “Provide for the ongoing accountability of building energy consumption over time.” The word “accountability” can send engineers scurrying for cover (refer to the November 2004 Tomorrow’s Engineer column titled, “Green Design Liability”).

Think about it -- is this Energy Credit intended to spur looking at the big picture or to look for flaws and hold someone accountable? I think The M&V plan intent should be stated in a more positive phrase. Maybe something like, “Intent: To continuously monitor the building energy consumption and continuously strive to improve energy conservation over the life of the systems.”

The next part of the current M&V plan description that I have a problem with is the option to isolate ECM’s (energy conservation measures) versus implementing a M&V plan that addresses the whole building. We need to begin to improve energy conservation “on the whole” and not invest M&V plans on individual ECM components. Let’s focus on the forest and not on a tree. If building owners have limited funds for a M&V plan, then let’s get the best buy for the money. Make ECM M&V plans an Additional Energy Credit while we make the whole-building M&V plan a prerequisite for any LEED certification.

The third issue with the M&V plan text is that it really doesn’t say how to write a M&V plan. Since our group (Building Solutions) provides commissioning services and commissioning is a prerequisite, we have the opportunity to participate in a lot more LEED projects as compared to design firms. Therefore, we also have the opportunity to observe a lot of design teams M&V plans. So far, we have seen little similarity between these M&V plans, which vary from 4 pages to 12 pages of text. This got me thinking about how the industry could use a standardized M&V plan that focuses on the whole-building energy consumption.

Here at RDK Engineers, we have a LEED luncheon discussion each Tuesday, so I offered to facilitate one of these lunch-and-learn sessions where I could gather data that I could possibly roll into a standardize M&V plan. Using a Smart board (a really neat electronic whiteboard/computer), I grouped the information into categories and then collected input. Here is how the session went:

Measurement & Verification Plan
A better strategy
To be a “good neighbor”
Benchmark energy budget to actual consumption
Ability to make “course correction”

Components
Energy simulation software
Meters
Additional building automation sensors
Trending
Facilitator
Web access
Designer confirm and adjust

Documentation
By utility companies
By building automation systems
By energy software
By backup calculations

Measuring (Meters & Sub-Meters)
Electric: kW, kWH, Time of Day
Gas: CFH
Water: CF
Steam: Lbs/Hr
Oil: Gallons
Chilled Water: Ton-Hrs, Peak Tons, CHWR Temperature
Hot Water: BTUH

Facilitator
Job Description
In-House
Out-Task

Reporting
Executive Summary
Benchmarks
Degree Days
Building Square Feet
BTUH per Square Foot per Year (all utilities)
BTUH per Square Foot per Year (by utility)

Want to know more about my quest for a standardized M&V plan? I hope to have the M&V Plan ready for review and comment soon, so check back here.

Recent Articles by BNP Media Staff

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
3/27/14 11:00 am EST

How to Calculate Backup Power Supply Requirements for Your Facility

On-Demand This webinar reviews how to determine power requirements of facility loads; electrical characteristics and impact of different types of loads such as large motors and UPS systems on power supply sizing; acceptable power sources and other constraints applied by building codes; and how software tools can be used to simplify the process of calculating backup power requirements.  

THE MAGAZINE

Engineered Systems Magazine

ES April 2014 cover

2014 April

Check out the April 2014 issue of Engineered Systems, with features on backup power supply requirements, cyberattacks, and much more!

Table Of Contents Subscribe

Design Flaws

Following up on Howard McKew's April "Tomorrow's Environment" column: Have you ever thought twice about reporting problems with another firm's design? What did you do?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon