The CG400-2060 Series of low-water cutoffs for low-pressure steam boilers feature timing sequences designed to provide more burner run time while providing protection against dry fires. The unit conducts the Intermittent Level Test for 60 sec every 20 min.

- Hydrolevel Company
FREE INFO: CIRCLE NO. 315