ES mobile app

Coming Soon...our new mobile app!

Articles Tagged with ''temporary HVAC''

Case In Point

Portable cooling helps the show go on at UC Berkeley

June 2, 2012
When the Pina Bausch dance company came to the University of California (UC) Berkeley for a weekend of live performances presented by Cal Performances in December 2011, the theater’s production team faced an unusual challenge. The show incorporated a vintage 1940 slide projector being shipped from Germany for use in the Zellerbach Hall auditorium, and Doug Warrick, general manager of Cal Performances, had to find a way to ensure that noise and heat buildup from the projector would not ruin the performance or, worse yet, create a fire hazard in the theater.
Read More

Doing Your Homework To Avert A Catastrophe

March 5, 2012
A learning environment adds extra meaning to the risks of “run to fail” mode, which can have the same effect on the budget as it does on the equipment. Covering everything from specification to installation and operation, schools need a permanent plan on hand for the moment when temporary HVAC becomes necessary.
Read More

Temporary HVAC: Homework Pays Off

March 3, 2011
School districts have known for quite some time that temporary equipment can assist in passing the tests of renovations or the pop quizzes of unexpected equipment failure. The lesser-known lesson is that having the plan in place can save significant time and money on top of the equipment’s basic benefits.
Read More

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
3/27/14 11:00 am EST

How to Calculate Backup Power Supply Requirements for Your Facility

On-Demand This webinar reviews how to determine power requirements of facility loads; electrical characteristics and impact of different types of loads such as large motors and UPS systems on power supply sizing; acceptable power sources and other constraints applied by building codes; and how software tools can be used to simplify the process of calculating backup power requirements.  

THE MAGAZINE

Engineered Systems Magazine

ES April 2014 cover

2014 April

Check out the April 2014 issue of Engineered Systems, with features on backup power supply requirements, cyberattacks, and much more!

Table Of Contents Subscribe

Design Flaws

Following up on Howard McKew's April "Tomorrow's Environment" column: Have you ever thought twice about reporting problems with another firm's design? What did you do?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon