ES mobile app

Coming Soon...our new mobile app!

Air movement

August 20, 2009
/ Print / Reprints /
ShareMore
/ Text Size+

Greenheck’s 134-page 2009 Quick Delivery catalog showcases its selection of high quality air movement equipment and accessories - in stock and ready for shipment in 24 hours. Greenheck offers more than 3000 ventilation products in stock or through its Quick Build program.The catalog features extensive sizing and performance data; easy-to-read service charts indicate each product model’s availability as in-stock, next day, or three-, five- or 10-day quick build. New to the 2009 Quick Delivery program are brick vents, CAD and HAD access doors, Miami-Dade louver Model ESD-635D, and three models of make-up air units. The Vektor-H laboratory exhaust fan, centrifugal inline fan Model BSQ-HP, and Model RGU non-powered gravity upblast ventilators are now available through the Quick Build program.

Greenheck ships in-stock products from six U.S. distribution centers. Stock products ship the same day if ordered by 2 p.m. CST, or the next day if ordered after 2 p.m. CST.

For a copy of the Quick Delivery catalog, visit www.greenheck.com.
You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
3/27/14 11:00 am EST

How to Calculate Backup Power Supply Requirements for Your Facility

On-Demand This webinar reviews how to determine power requirements of facility loads; electrical characteristics and impact of different types of loads such as large motors and UPS systems on power supply sizing; acceptable power sources and other constraints applied by building codes; and how software tools can be used to simplify the process of calculating backup power requirements.  

THE MAGAZINE

Engineered Systems Magazine

ES April 2014 cover

2014 April

Check out the April 2014 issue of Engineered Systems, with features on backup power supply requirements, cyberattacks, and much more!

Table Of Contents Subscribe

Design Flaws

Following up on Howard McKew's April "Tomorrow's Environment" column: Have you ever thought twice about reporting problems with another firm's design? What did you do?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon