Evolving facility needs, revenue-generating special events, in-house labor, the deferred maintenance budget … the factors in a temporary HVAC decision range wider than you might think. So are the opportunities.
Engineers who pull out the 2015 ASHRAE Handbook HVAC Applications or 2016 HVAC System and Equipment Handbook will not find the topic of temporary HVAC systems. And yet, these applications probably occur on half of the major construction projects each year. If the engineer Googles “designing a temporary HVAC building system,” the internet will bring up numerous pages listing companies that rent, install, operate, maintain, and remove temporary heating equipment/systems as well as ventilation equipment and cooling equipment/systems.