magazine

Stay Connected with Engineered Systems
We are on Facebook, Twitter, LinkedIn, etc.

Heating & Boilers / Today's News

Cleaver-Brooks sells its first ultra-low emission boilers in China

Cleaver-Brooks Boilers (Shenzhen) Co. Ltd., based in Shenzhen, China, has sold the first of its first Ultra Low Emission boilers in China to Red Titan, a 38-story building located in Ningbo that features apartments, offices, retail stores, entertainment, restaurants and a gymnasium. Cleaver-Brooks is currently assembling three Model 4WI LE (Low Emission) boilers for the 655,500-square-foot Red Titan mixed-use building.

Cleaver-Brooks opened an assembly plant in China in April 2009 to meet the growing demand for high-efficiency, eco-friendly products in Asia. The company’s plants throughout the United States and Canada will continue to manufacture boilers for its North American, Latin American and Middle Eastern customers.

 “Cleaver-Brooks has had a presence in China for more than 30 years, and the company has an excellent reputation, particularly among multinational companies that are doing business here,” said Stephen Li, general manager, Cleaver-Brooks Boiler (Shenzhen) Co. Ltd. “Establishing a physical presence in China allows us to more effectively offer the Asian market eco-friendly technology that significantly exceeds China’s clean air standards.”

“Sales of Cleaver-Brooks boilers in China have been strong” added Li. “In addition to the Red Titan building, we are currently working with numerous internationally recognized companies in the beverage, pharmaceutical, and hospitality sectors.”
You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!
5/13/15 11:00 am EDT

When's & Why's of Fuel Options and Selection for Backup Power

ON DEMAND This presentation will bring listeners up to speed on what the best options are today and in the near future. 

Engineered Systems Magazine

CoverImage

2015 May

Check out the May issue of ES with the cover story: VRF with Heat Recovery Ventilation In PreK-12 Schools.

Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

With access to over one million professionals and more than 60 industry-specific publications, Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon  Google+