free webinar

Keep cool and register for Critical Cooling & Controls!
On-site at AHR Expo, January 27th in Chicago! Limited to 150 attendees…

Today's News

Daikin takes part in ASHRAE HQ renovation

November 11, 2008
/ Print / Reprints /
ShareMore
/ Text Size+

Daikin Industries, Ltd., parent company of Daikin AC (Americas), Inc., based in Texas, donated several heating and air conditioning systems that service the entire first floor and learning center of the newly renovated ASHRAE Headquarters, located in Atlanta. Daikin also provided the funding for the first reception area, known as the Daikin Reception Area, and a vegetative roof garden, which will be named the Daikin Sustainability Garden.

Completed in July, the $7.65 million renovation includes a new learning and meeting center. The Grand Opening Ceremony was held at the newly renovated facility on October 23, 2008.

During the ceremony, several Daikin officials as well as industry leaders were present to congratulate the ASHRAE’s Headquarters Renovation Committee on their achievement in building this living laboratory to showcase throughout the world.  The living laboratory will be used for experimentation, research, and testing.  Visitors to the ASHRAE Headquarters can access detailed data on the operation of Daikin’s systems as well as the other equipment installed in the facility on large plasma screen mounted in the lobby.

The donation included a VRV® III Variable Refrigerant Volume Heat Recovery Systems, VRV® -S Variable Refrigerant Volume Heat Pump Systems, SkyAir Heat Pump Systems and a mixture of Daikin ducted and duct-free fan coils.  A Daikin Intelligent Touch Controller, a BACnet® gateway interface and the 24-hour online Remote Monitoring System were also specified for the installation.

The Daikin systems used to service the first floor and learning center provided a solution to increase the usable space without any costly building modifications. The non-ozone depleting potential refrigerant, individual zone control capabilities, and heat recovery technology helped the ASHRAE organization to reach their goals of building an energy efficient and sustainable headquarters.

In recognition of Daikin’s commitment to the environment, Daikin also made a financial contribution to install a vegetative green roof at the ASHRAE headquarters. On hot summer days, the surface of a traditional rooftop can be up to 90°F (50°C) warmer than a vegetated rooftop  Daikin’s investment will protect the underlying roof material from the sun's ultraviolet (UV) radiation and extreme daily temperatures. This will result in lowering the amount of energy needed to heat and cool the building thus reducing the ASHRAE building’s carbon footprint and CO2 emissions.

Links

You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

ES Gallery: Snapshots & Systems

Check out highlights from projects featured in our magazine this year!

Engineered Systems Magazine

image

2014 December

Check out the December 2014 issue of Engineered Systems.
Table Of Contents Subscribe

System Design

Based on your experience and knowledge level, are you currently comfortable designing or maintaining a system incorporating VRF or radiant ceiling panels?
View Results Poll Archive

THE ENGINEERED SYSTEMS STORE

The_Green_Energy_Management
The Green Energy Management Book

Learn from our experts how to evaluate job opportunities, market your services, sell a Walk-through Survey, target areas for an Energy Audit, calculate energy savings, do retrofit work, and win continuing contracts for retrofit work.

More Products

Clear Seas Research

Clear Seas Research ImageWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Tomorrow's Environment Podcast

This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click HERE to be taken to the podcast page!

STAY CONNECTED

new Facebook icon Twitter icon YouTube iconLinkedIn icon  Google+