I touched on the importance of design-build (D-B) project schedules last month, so this month I’d like to elaborate further on this management tool. Let’s start with an example, such as the renovation of a historical building located on a busy street in a major city. The project scope of work is to replace an antiquated steam heating system and split-system air conditioning equipment with a two-pipe hvac system.