Advertisement:
  LoginNew User? 
Forgot Password 
  HOME
  Subscribe
  WEB EXCLUSIVE
  ES Engineering Awards
  Articles
  Webinars
  Podcasts
  ES Blog
  White Papers
  Back2Basics - Solutions
  PRINT ISSUE
  Features
  Columns
  Case In Point
  Issues and Events
  Departments
  Letters to the Editor
  Green Intelligent Buildings Supplement
  Classified Ads
  Ad Index
  ES Glossary
  HVAC Challenge
  HVAC Designer Tips
  RESOURCES
  Archives
  Back2Basics
  Career Center
  List Rental
  Reprints
  Mechanical Products Sourcebook
  Calendar of Events
  Industry Links
  Request Product Info
  PennWell Books
  Media Kit
  About Us
  Contact Us
  Market Research
Search in: EditorialProductsCompanies
Email this Article Print View
Cleanliness Counts

November 1, 2006



This letter refers to Howard McKew’s “Tomorrow’s Engineer” column in the September 2006 issue of Engineered Systems, titled “Cleanliness During Construction” (page 98).

The nearest thing to a standard about the effect of allowing construction dust into air conditioning equipment may be SMACNA’s “Duct Cleanliness For New Construction Guidelines,” although it does not address this issue directly.

There are four very important things to remember:
  • No practical commercial HVAC air filter is 100% effective:
Glancing at the ASHRAE Handbook — Systems and Equipment, we see that even the best filters that are normally used in commercial HVAC equipment have an arrestance of less than 100%. This means that the remainder goes through the filter to the evaporator.
  • Portland cement and plaster of Paris do not harden by drying.
Concrete does not harden by drying. If it did, builders in hot climates would not have to keep concrete from drying out before it sets.

Portland cement is a compound made up primarily of calcium, aluminum, and silica. In its dehydrated form (fresh from the kiln), it has very little strength. However, when water and Portland cement are mixed, the result is a solid hydrate. Water molecules bind to the cement, and allow the formation of internal binding structures. The water becomes part of the concrete.

Plaster of Paris works very much like Portland cement, though less water is involved.
  • The evaporators of air conditioning equipment are often wet due to condensation.
If the surface temperature of an air conditioner evaporator is below the dewpoint of the room air, then water will condense onto the evaporator. In humid climates, this is a wonderful thing.

If active Portland cement dust or plaster of Paris dust touches the condensed water on the evaporator, you get concrete or plaster in your evaporator fins. This is not wonderful at all.
  • Concrete and plaster are not good heat conductors.
Compared to aluminum fins and copper tubes, concrete and plaster are not good conductors of heat. Lots of little dabs of concrete or plaster in an evaporator causes (a) a reduction of airflow, and (b) reduction of heat transfer. The net result is an immediate reduction of performance and possible long-term damage to the compressor.

The worst case of this that I have ever seen was due to “stealth concrete.” The units in question were worth tens of thousands of dollars, so the original installers carefully prevented any construction dust from entering them.

The stealth arose because of a process called “tile re-pointing.” After a few years, the grout lines in some tile floors get too dirty to clean. The building owner had a tile contractor re-point the tile, which means grinding out the old grout with electric grinders and then putting in new grout. As a favor to the contractor, the building owner left the air conditioners running.

This was repeated every few years.

The edge of a grinding wheel running in cement grout is hotter than the original cement-dehydrating kiln. This means that some of the dust blowing off the grinder wheels had been dehydrated to active Portland cement again. The air conditioners drew in this active dust, some of which went through the filters and contacted the wet evaporator. By the time I arrived, the evaporators looked like poorly plastered walls and the compressors had died of floodback.

In summary, if any Portland cement or plaster of Paris dust (among others) might be present in the air, it is important ahead of time to:
  • Turn off the blower for any cooling coil that might condense water.
  • Tape plastic or paper over the return grilles.

James Hogan
Product Development Engineer
Dectron, Inc.
Roswell, GA



Did you enjoy this article? Click here to subscribe to the magazine.







Click the button below to sign up to receive both of our NEW Newsletters.
Receive one now (Controls E-newsletter or IAQ E-newsletter) and the other at a later date, or receive BOTH E-newsletters.









AEE Jobs






Subscribe Now!Subscribe to Engineered Systems
Engin-
eered Systems
provides monthly articles relating to non-residential HVACR equip. and components. Sign up for your FREE subscription today!
Subscribe

Advertisement:
© 2008 BNP Media. All rights reserved. | Privacy Policy