|
| Sustainable & Attainable
Insights, checklists, downloads, and more about wise building and O&M practice as it pertains to the LEED(r) certification process. Updated regularly, with comments and conversation encouraged.
Howard McKew, P.E., CPE is Director of the Building Solutions Group at RDK Engineers, a multifaceted Consulting firm with offices in Andover and Boston, MA and
New Brunswick, NJ. He has also pursued the establishment of
commissioning standards and the benefits of standardized checklists and surveys in the building and commissioning industry; info is available at www.buildingsmartsoftware.com.
Recalibrate-Recall-Recycle Recommissioning Control Devices
There are three recommissioning methods; Recalibrate-Recall-Recycle, and if you
have the opportunity to participate in a LEED project, and more specifically the
compiling of the Systems Manual, you'll become quite familiar with them. Read on
for more information.
by Howard McKew, P.E., C.P.E. | April 9, 2007 | Comments (0)
|
What Is Acceptable Training & Who Should Provide The Training?
Part of the LEED certification process is to assure that training is provided,
but what kind of training is needed, who should provide the training, and who
should receive the training?
by Howard McKew, P.E., C.P.E. | February 12, 2007 | Comments (5)
|
My Interpretation of the Re-Commission/System Manual
ES’ Howard McKew provides valuable recommissioning manual corrections and clarifications for the LEED 2.1 workbook. Read on for specific documentation and details on how to assign a document collector for LEED recommissioning projects.
January 17, 2007 | Comments (1)
|
Making The Measurement & Verification Plan A Positive Purpose
by Howard McKew, P.E., C.P.E. | January 3, 2007 | Comments (4)
|
Measurement & Verification, Part 2: Making The Plan
by Howard McKew, P.E., C.P.E. | August 17, 2006 | Comments (0)
|
| <<First | <Previous | 1 | 2 | 3 | Next> | Last>> |
| | |